P C Construction

on Tuesday, 03 December 2013. Posted in Gabion

BAM Nuttall Ltd, Luton, Dunstable

pc construction 1
P C Construction's contract work included.The supply of plant and labour to place concretefoundation, construct the gabion walling andthe placement of backfill.
  • Total m3: 320
  • Maximum Height: 2m
  • Construction Time: 1 weeks

Mansell, Hackney, London

pc construction 2
P C Construction's contract work included.The supply of plant, labour and materialsto construct the gabion walling.Gabion walling was used to retain an embankment on a new School.
  • Total m3: 650
  • Maximum Height: 3.5m
  • Construction Time: 2 weeks

Oliver Connell & Son, Manchester Airport

p c construction 3
Gabion walling was used to retain the cuttings on the new radar station at Manchester Airport. P C Construction's contract work included. The supply of plant and labour to construct the gabion wall.
  • Total m3: 185
  • Maximum Height: 3m
  • Construction Time: 1 weeks

Andy Beard